Thursday, July 21, 2011

Basement Progress

With the drywalling complete, the basement takes shape.  It's going to be great space, a huge rec room, two bedrooms, a full bath, and my "man cave".  Here's some pics.

This shot is from the front (lake facing side) looking toward the back.  Doors to the two bedrooms on the right, there's a full bath off to the left, and the utility room/man cave to the rear.  The "mudders" had just completed their work so the fans were helping to dry the mud.


Here's two shots of the rec room area from either end.  Anyone got an extra pool table?



The "man cave".  This is the area where the utilities all reside, I'll have a workbench, and railroad space.  Whether the railroad invokes "eminent domain" or not on other areas of the basement remains an open issue.




3 comments:

  1. I've been transferring computers and haven't seen these posts in a while... wow! The siding looks great--the deck is amazing--and the basement is huge! We're in the middle of a small kitchen remodel; I can't imagine building a house from the ground up. How exciting!

    ReplyDelete
  2. If there isn't a partially completed railroad layout in the basement, it don't say Washow on the mailbox.

    Doug

    ReplyDelete
  3. This train needs some cup holders to move drinks from the bar to areas around the house.

    ReplyDelete